Author: Erscon

Engineering

Bynoe Causeway, Normanton

Bynoe Causeway, Normanton QLD

Administration

  • Asset management assessments
  • Contract administration
  • Training when required

    Aerodrome Planning and Design

  • Aerodrome design
  • Analysis and reporting
  • Management of field investigation
  • Materials analysis
  • Site assessment and sampling
  • Slope stability analysis

    Coastal and Marine

  • Boat ramp construction
  • Marine infrastructure
  • Pontoons and piling
  • Seawall remediation works

    Dams

  • Dam infrastructure design

    Environment

  • Erosion and sediment control
  • Flood and stormwater modelling and design
  • Stormwater quality improvement devices
  • Water balancing
  • Water quality modelling
  • Water sensitive urban design

    Land Development

  • Design and contract administration
  • Development approvals process
  • Drainage design
  • Earthworks, roads and services
  • Engineering services for private land developers
  • Industrial and commercial developments
  • Infrastructure
  • Management of investigations, survey and planning
  • Residential subdivisions and development
  • Shopping centres and commercial projects

    Local Government

  • Approvals and scope definition
  • Betterment submissions
  • Delivery set-out, progress and QA review
  • Investigation and submission documentation
  • Program, payment and progress reporting
  • Project records and close-out processes

    Municipal Engineering

    Natural Disaster Relief and Recovery Arrangements (NDRRA)

    Road, Traffic and Carpark Engineering

  • At-grade intersections
  • Carpark design and drainage
  • Highway and traffic engineering and management
  • Pavement design
  • Pedestrian and cycle facilities

    Water and Sewerage Reticulation

  • Network analysis and design
  • On-site effluent disposal
  • Pump stations and rising mains
  • Reticulation services
  • Sludge drying beds design and specification
  • Trunk Infrastructure
  • Water supply analysis
  • NDRRA/Local Government

    Aurukun Access Road, Aurukun

    The ERSCON team has provided project management services to Carpentaria Shire Council for it’s extensive restoration programs following significant damage as a result of several declared events and associated flooding in the region.

    • Provision of on-site damage assessments
    • Preparation of submission documentation (including Form 1, Form 4, Form 5 & Form 6 and supporting documentation)
    • Negotiation of approved scope and management of approvals timing to suit construction program
    • Preparation of works packages and plans for including scope drawings, detailed works descriptions and QA procedures.
    • On-site construction and project management services and support
    • Progress claim submissions and liaison with QldRA project control branch
    • Preparation and submission for Form 13 Extension of Time requests as necessary
    • Submission and auditing of project/event close out and management through to final claim payment.